CERN Accelerating science

AC Articles

新增:
2003-12-13
03:25
SPS Pb beam : results and prospects / Faugier, A
1995
In : Cogne VIII, Cogne, Italy, 29 May-3 Jun 1995, pp.1375-1388

详细记录 - 相似记录
2003-12-04
04:42
Experience with INB regulations at CERN / Faugier, A (CERN)
CERN, 2003 Published version from CERN: PDF;
In : Workshop on Radiation Protection Issues Related to Radioactive Ion-Beam Facilities (SAFERIB), CERN, Geneva, Switzerland, 30 Oct - 1 Nov 2002, pp.174 (CERN-2003-004)

详细记录 - 相似记录
2002-10-14
00:00
Operations at CERN under INB Regulations / Faugier, A
CERN, 2001 Published version from CERN: PDF;
In : Workshop On Accelerator Operation, Villars-sur-Ollon, Switzerland, 28 Jan - 2 Feb 2001, pp.131-133 (CERN-2001-002)

详细记录 - 相似记录
2002-06-25
00:00
From LHC design to machine commissioning / Faugeras, Paul E
Geneva : CERN, 2000
In : 2nd International Symposium on LHC Physics and Detectors, v.1, Dubna, Russian Federation, 28 - 30 Jun 2000, pp.331-372

详细记录 - 相似记录
2002-03-28
00:00
First Powering of the LHC Test String 2 / Saban, R I ; Bordry, Frederick ; Bozzini, D ; Dahlerup-Petersen, K ; Denz, R ; Puccio, B ; Rijllart, A ; Rodríguez-Mateos, F ; Schmidt, R ; Serio, L et al.
String 2 is a full-size model of a regular cell in an LHC arc. In the first phase, three dipole magnets and two quadrupole magnets have been assembled in String 2 and commissioning started in April 2001. [...]
LHC-Project-Report-565; CERN-LHC-Project-Report-565.- Geneva : CERN, 2002 - 5 p. - Published in : IEEE Trans. Appl. Supercond. 12 (2002) 232-235 Access to fulltext document: PDF; IEEE Published version, local copy: PDF;
In : 17th International Conference on Magnet Technology, CERN, Geneva, Switzerland, 24 - 28 Sep 2001, pp.232-5 - Please contact the library if you need to access this document.

详细记录 - 相似记录
2001-10-15
00:00
The LHC Project : Status and Prospects / Faugeras, Paul E
The Large Hadron Collider (LHC), CERN's future major facility for high-energy physics, has entered into the construction and preparation for installation phases. After recalling briefly the main machine design choices and challenges, one will review the progress of civil works for the machine and experimental areas and the status of the main LHC components, which are presently series-built and for some of them procured in kind through world-wide collaborations. [...]
CERN-OPEN-2001-071.- Geneva : CERN, 2001 - 5 p. Access to fulltext document: PDF; External link: Published version from JACoW
In : 2nd Asian Particle Accelerator Conference, Beijing, China, 17 - 21 Sep 2001, pp.MOD05 - Please contact the library if you need to access this document.

详细记录 - 相似记录
2001-07-25
00:00
Handling non-conformities in the tunnel / Saban, R I
Geneva : CERN, 2001
In : LHC Days, Villars-sur-Ollon, Switzerland, 19 - 21 Mar 2001, pp.85-88

详细记录 - 相似记录
2001-02-16
00:00
Protection and diagnostics / Schmidt, R
Geneva : CERN, 2000 Fulltext: PDF;
In : 10th Workshop on LEP-SPS Performance, Chamonix, France, 17 - 21 Jan 2000, pp.203-207

详细记录 - 相似记录
2001-02-16
00:00
Operations without beam / Saban, R I
Geneva : CERN, 2000 Fulltext: PDF;
In : 10th Workshop on LEP-SPS Performance, Chamonix, France, 17 - 21 Jan 2000, pp.191-193

详细记录 - 相似记录
2001-02-16
00:00
The LHC controls and operations forum, 1-2 December 1999 / Proudlock, Paul
Geneva : CERN, 2000 Fulltext: PDF;
In : 10th Workshop on LEP-SPS Performance, Chamonix, France, 17 - 21 Jan 2000, pp.188-190

详细记录 - 相似记录